Page 1
Otter Pro XT Cabin Installation and Set-Up Instructions Otter Pro XT Cabin Fits Medium Otter Pro and Otter II Sled Only Parts Identification and Check List MODEL NUMBERS: MODEL NUMBERS: MODEL NUMBERS: MODEL NUMBERS: MODEL NUMBERS: Complete Pkg Complete Pkg...
Page 2
Tools Required: Ratchet & 7/16” socket 7/16” wrench Short extension for Ratchet or 7//16” deep socket Drill/Driver Phillips Bit Phillips Screwdriver ½” Wrench ½” socket 5/16” Drill Bit 7/16” Drill Bit Installing the seating system before assembling the frame and canvas will make installation easier.
Page 3
2. Slide brackets and swivel part way onto the plastic base. Adjust the fit to be snug by pressing in on the brackets. However the brackets still need to be able to slide smoothly back and forth on the plastic base. Tighten the bolts securely once the fit is correct. Press in on slide Tighten all 4 nylock brackets and adjust...
Page 4
4. Drill out the four pre-marked holes for the seat rail brackets as shown using a 5/16” drill bit. The sled may be tipped upside down to make drilling the holes easier. Drill four pre-marked holes at these locations. Drill these 2 pre-marked holes with Drill these 2 pre-marked holes with a 5/16 drill bit.
Page 5
Install plastic end caps here. Secure with ¾” self tapping screws. 6. After the brackets and end caps are installed the seat rail may be bolted into place with the ¼” bolts, washers and nylock nuts using the previously drilled holes. Install plastic base and seat onto the rail.
Page 6
Seat assembly not shown for clarity. 7. Position sled (Item 1) as shown in Diagram 7, with curved front to your left. 8. Drill the 4 marked holes using a 5/16” bit. 9. Drill the 7/16” hole in center of lip approximately 16 inches from bend in sled. The back wind support bar (Item 5) is to be propped here.
Page 7
11. Assemble Back and Center Main Frame Bars: Insert the outer main frame bar (Item 13) into the middle main frame bar (Item 14). Fasten with self-tapping screw (Item 22), plastic protector (Item 33), and star washer (Item 34). Slide the sleeve (Item 21) over the main frame extension bar (Item 11). (Line up holes with button lock, press lock in as you slide over the bar).
Page 8
13. Assemble Front Main Frame Bar: Insert the outer main frame bar (Item 12) into the middle main frame bar (Item 14). Fasten with self-tapping screw (Item 22), plastic protector (Item 33), and star washer (Item 34). Slide the sleeve (Item 21) over the main frame extension bar (Item 10). (Line up holes with button lock, press lock in as you slide over the bar).
Page 9
15. Assemble Bottom Main Frame Bar: Insert the outer main frame bar (Item 13) into the middle main frame bar (Item 14). Fasten with self-tapping screw (Item 22), plastic protector (Item 33), and star washer (Item 34). Slide the sleeve (Item 21) over the main frame extension bar (Item 9). (Line up holes with button lock, press lock in as you slide over the bar).
Page 10
17. Set up main frame bars by grasping with both hands and pushing upward until button clicks into place. Start with bottom main frame bar and continue to the back main frame bar pushing lengthened bars into appropriate position. Ref. Diagram 15. Center Main Diagram 15 Frame Bar...
Page 11
19. Slide the tent over the main frame bar assembly, then fasten the velcro straps on the inside of the tent to each main frame bar. Note: Collapsing the center and front main frame poles part way down will make installation easier.
Page 12
21. On the front of the fishhouse, start in the corners and work inward, snap the plastic trim seal on the canvas tent (Item 2) to the lip edge of the sled (Item 1). The tent (Item 2) will meet in the middle and should be free to open and close so it can be removed.
Page 13
Otter Outdoors Inc. 411 W Congress St. • Maple Lake, MN 55358 Otter Pro XT Cabin Phone 320-963-6480 • www.otteroutdoors.com October, 2015 Page 13...
Need help?
Do you have a question about the Pro XT Cabin and is the answer not in the manual?
Questions and answers