Installation - Horizon Fitness PJ-77R Manual

Papper jogger
Table of Contents

Advertisement

2-2 Installation

NOTE
Prepare room at the delivery side of collator
where PJ-77/PJ-77R can be installed.
1.
Loosen lock knob and fix delivery direc-
tion down.
2.
Install PJ-77/PJ-77R at the delivery side of
collator.
Then divide 10 mm clearance between
delivery roller and tray.
NOTE
PJ-77/PJ-77R has casters. Move PJ-77/PJ-
77R by tilting it as shown in the right draw-
ing.
3.
Depress start button and check button of
collator, then feed sheets. Depress stop
button when the edge of sheets reach at
delivery unit.
4.
Install PJ-77/PJ-77R with 5 mm clearance
between sheets and side guide.
5.
Connect two cables to receptacle of colla-
tor.
2. Installation and Operation Instructions
Delivery Unit
DOWN
10 mm
caster
5 mm
Sheets
7
Lock Knob
Delivery Unit
Cables

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pj-77

Table of Contents