Download Print this page

PHD GRS Series Manual

Switch kits & installation, solid state & reed switch mounting requires-cu option

Advertisement

Quick Links

INSTALLING & ADJUSTING 6790 SWITCHES.
1) Insert switch into switch bracket as shown.
2) Slide switch and bracket assembly into slots in body.
3) Adjust on/off position of switch and bracket assembly
per your requirements.
4) Tighten switch screw to recommended torque specification.
(see Table 1)
INSTALLING & ADJUSTING JC1 SWITCHES.
1) Insert switch into switch bracket oriented as shown. Align
switch screw with hole on side of the bracket (see JC1 Switch
Detail View)and tighten to the recommended torgue specification.
(see Table 1)
2) Slide switch and bracket assembly into slots in body.
3) Adjust on/off position of switch and bracket assembly
per your requirements.
4) Tighten bracket set screw to recommended torque specification.
(see Table 1)
INSTALLING TARGET ASSEMBLY
1) Apply removable threadlocker to target mounting set screw,
loosely install in target assembly.
2) Place target assembly on -CU target pin with magnet orientation
marker aligned as shown.
3) Tighten target mounting set screw to the recommended
torque specification. (see Table 1)
SERIES JC1SDx
SWITCH MOUNTING KITS
DO NOT EXCEED RECOMMENDED TORQUE SPECIFICATIONS
14
SERIES JC1STx
JC1 SWITCH DETAIL VIEW
BACK OF SWITCH
FRONT OF SWITCH
(PHD LOGO, LED,
HEX SET SCREW)
SWITCH BRACKET
MOUNTING SCREW
HEX WRENCH
(SUPPLIED WITH SWITCH)
6790 & JC1SDx
.10
14
.10
14
SWITCH
BRACKET
JC1STx SWITCH MOUNTING KITS
.10
14
.10
14
6441-427C
.10

Advertisement

loading

Summary of Contents for PHD GRS Series

  • Page 1 2) Slide switch and bracket assembly into slots in body. SWITCH 3) Adjust on/off position of switch and bracket assembly BRACKET per your requirements. FRONT OF SWITCH (PHD LOGO, LED, 4) Tighten switch screw to recommended torque specification. HEX SET SCREW) (see Table 1) SWITCH BRACKET MOUNTING SCREW INSTALLING &...