LG UB85W.N94R0 Installation Manual page 9

Ceiling concealed duct
Table of Contents

Advertisement

• Select and mark the position for fixing
bolts.
• Drill the hole for set anchor on the face
of ceiling.
• Insert the set anchor and washer onto
the suspension bolts for locking the
suspension bolts on the ceiling.
• Mount the suspension bolts to the set
anchor firmly.
• Secure the installation plates onto the
suspension bolts (adjust level roughly)
using nuts, washers and spring
washers.
!
CAUTION
Tighten the nut and bolt top revent unit falling.
The indoor unit installation
Old building
1 Set anchor
2 Plate washer
3 Spring washer
4 Nut
5 Suspension
bolts
• Local supply
① Set anchor
② Plate washer
③ Spring washer
④ Nut
⑤ Suspension bolt
New building
- M10
- M10
- W3/8 or M10
- W3/8 or M10
Installation Manual 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ub70w.n94r0

Table of Contents