Installation; Installing The Camera; Ceiling Mount - Ganz G2 THERMAL ZNT1-P Series Installation Manual

Table of Contents

Advertisement

ZNT1-­‐P   S eries  

4. INSTALLATION

4.1. Installing the camera

Ceiling Mount

Padlock   m arks  
Alignment    
    m arks  
 
 
1) Install   t he   c eiling   m ount   t o   a   c eiling   t hat   c an  
bear   t he   w eights   o f   t he   m ount   a nd   t he   c amera.  
2) Drop   a ll   t he   n ecessary   c ables   f rom   t he   c eiling  
through   t he   p ipe   o f   t he   c eiling   m ount.  
3) To   o pen   t he   t op   c ap   o f   t he   c amera   t o   i nstall   t he  
camera,   l oosen   t he   t orx   s crew   o n   t he   t op   c ap   o f   t he  
camera   b y   u sing   t he   t orx   L -­‐wrench   i ncluded   i n   t he  
package.  
Torx   s crew  
4) Open   t he   t op   c ap   b y   t wisting   i t   c lockwise   a nd  
making   t he   a lignment   m arks   b oth   o n   t he   t op   c ap  
and   t he   c amera   b ody   a ligned   t o   t he   o pened   p adlock  
mark   o n   t he   t op   c ap.  
5) Put   t he   c amera   b ody   a side.    
6) Attach   t he   t op   c ap   o f   t he   c amera   t o   t he   c eiling  
mount   b y   i nserting   t he   n eck   o f   t he   t op   c ap   t o   t he  
ceiling   m ount   a nd   r otating   t he   t op   c ap   c ounter-­‐
clockwise   u ntil   i t   c annot   r otate   a nymore.  
7) Insert   t he   p rovided   t wo   s et   s crews   t o   e ach   o f   t he  
screw   h ole   o n   t he   c eiling   m ount   a nd   t ighten   t hem  
to   f irmly   a ttach   t he   t op   c ap   o f   t he   c amera.  
CBC   A merica   L LC.  
ITC4500   I nstallation   G uide    
 
7  

Advertisement

Table of Contents
loading

This manual is also suitable for:

G2 thermal znt1-pxt2G2 thermal znt1-pxt1

Table of Contents