Download Print this page

Viessmann MPA51 Operating And Service Instructions page 25

Gas burner control unit replacement

Advertisement

Flow diagram
(cont.)
After the controller issues a heat
demand, the following program
sequence will be run:
Phase
00
Fault
01
Waiting for heat demand
03
Fan idle state check
04
Air pressure switch idle state check
06
Fan ramp-up
07
Waiting for air pressure
08
VPS decision: Valve tightness check
09
VPS: Clear intermediate valve space
10
VPS test time: Valve 1
11
VPS: Fill intermediate valve space
12
VPS detection: Gas pressure
13
VPS test time: Valve 2
14
Pre-purge time
16
Ignition setting
17
Gas detection: Gas pressure switch min.
18
Pre-ignition time
19
Ignition safety time (SZA)
20
SZA flame recognition
21
Flame stabilising time
23
Changing to control mode
24
Control mode
25
Changing to controlled shutdown
32
Burner run-on time
33
Post-purge time
34
Restart blocking time
01
Waiting for heat demand
In the case of fault shutdown:
35
Gas shortage: Gas pressure switch min.
36
On hold program
Flow diagram
Duration
0 ...
0 ...
max. 2 min
max. 5 s
max. 2 min
max. 5 s
0.1 s
1 to 3 s
1 to 240 s
1 to 3 s
0.1 s
1 to 240 s
0 to 1 h
max. 2 min
0 ...
0 to 1 min
0.5 to 9.4 s
0.5 s
1 to 200 s
max. 2 min
0 ...
1 to 30 s
1 to 60 s
0 to 1 h
0 to 1 h
0 ...
0 ...
0 ...
25

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Mpa5113