Preparing For Operation; Service; Standards For Model - LG LZ-H025GBA4 Installation Manual

Hide thumbs Also See for LZ-H025GBA4:
Table of Contents

Advertisement

Preparing for operation

1. Contact an installation specialist for installation.
2. Plug in the power plug properly.
3. Use a dedicated circuit.
4. Do not use an extension cord.
5. Do not start/stop operation by plugging/unplugging the power cord.
6. If the supply cord is damaged, it must be replaced by the manufacturer, its service
agent or similarly qualified persons in order to avoid a hazard.

Service

1. For repair and maintenance, contact your authorized service dealer.
2. The appliance shall be disconnected from its power source during service and when
replacing parts

Standards for Model

L
Z - H
0
5
0
G B A
5
Development Sequence
Function
A: Basic
Model Type
B: Ceiling Concealed Type
Electrical Standard (Volts, Freq., Phase)
220-240 V, 50 Hz, 1 ph / 220 V, 60 Hz, 1 ph
Capacity
Ex) 080
800 CMH 100
Heat Exchange Type
H: Total Heat Recovery
Indicates that this is LG's VENTILATION system
Installation manual 7
Safety precautions
1,000 CMH

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents