2.7. MOUNTING RAILS AND POSTS ........................8 2.8. MOUNTING THE DISTANCE TUBE(S)......................10 2.9. ALIGNMENT OF THE SYSTEM ........................11 3. LINE SYSTEMS ................................ 12 4. INITIAL OPERATION ..............................13 5. DISMOUNTING ................................ 14 6. TROUBLESHOOTING .............................. 14 7. ANNEX..................................15 Helioscreen Australia Pty Ltd...
The safety-at-work and accident prevention regulations specific to each country must be complied with. In particular, a person performing special work at height must be suitably secured. The notes on the product and its packaging must be observed Helioscreen Australia Pty Ltd Page 3...
Hoist the awning exclusively in horizontal position and evenly. If the information above is not observed, the awning system may fall down and put the health of persons at risk! Helioscreen Australia Pty Ltd Page 4...
approx. approx. 100 mm 100 mm 175 mm 75 mm approx. approx. 130 mm 130 mm Helioscreen Australia Pty Ltd Page 5...
If required, slightly fix the pivot. • Re-install the cover of the guiding rail. • Insert the post profile with the pivoting bearing into the • Insert the post profile with the pivoting bearing into the base plate. base plate. • • Re-install the cover of the guiding rail. Re-install the cover of the guiding rail. Profile edge Profile edge Helioscreen Australia Pty Ltd Page 8...
Page 9
• Remove pulling cords for the fall bar. Adjust the Adjust the inclination of the brackets (the gap between inclination of the brackets (the gap between the the guide rail and the casing end cap must be uniform) guide rail and the casing end cap must be uniform) Helioscreen Australia Pty Ltd Page 9...
• Lock the nuts against the end caps of the distance tube. 2.10. alignment oF the SyStem • Align the system by moving the casing in the brackets or sideways movement of the two posts in the diagonal. Deviations of the diagonal measurements by more than 5 mm may result in malfunctions. • Vertically align the posts Helioscreen Australia Pty Ltd Page 10...
2.8, it is necessary to fit the second pulling strap with the pulley. • For the installation, pull the fall bar of both systems on Helioscreen Australia Pty Ltd Page 11 the side of the centre guide rail approximately 100mm Chamfer in extended direction with the pulling strap, and then...
If the test cable has not yet been connected, connect to the cable of the driving gear. Fully extend awning and check switch-off point. Electrical installation work and connections to the mains must be carried out exclusively by a licensed electrical company. Helioscreen Australia Pty Ltd Page 13...
When operated, system moves by jerks and jolts or generates indefinable noises Foreign bodies or lots of dirt in the channels of Clean guiding rails and spray lubricant on the guiding rails the rollers of the fall bar Helioscreen Australia Pty Ltd Page 14...