Phase 5: Maintenance - PIC-PLAST SOLARIG Alpine 135 Installation Manual

Tunnel kit
Table of Contents

Advertisement

Phase 5: Maintenance

You should perform preventive maintenance on the Alpine-135 structure once a month:
TM
SOLARIG
plastic covers and nets: Verify that the plastic sheets are stretched out
and not flapping. Check for holes and cuts in the nets and plastic sheets. Sew cuts or
holes closed with a needle and thread.
Cables: Make sure the cables are tight. If the cable is slack, tighten using the tension
tool and investigate the state of the clamps.
Structure: Make sure that all screws are tight and in place.
Installation Manual for Model Alpine-135
- 41 -
SOLARIG™ TUNNEL KIT

Advertisement

Table of Contents
loading

Table of Contents