2. Add L brackets MTTA10040 to middle arcs (all arcs except for the first and last) at
the peak.
3. Add cables (#4) between middle arcs at 2/3 height on both sides of the structure
(Figure 22).
Figure 22: Middle arcs. stabilized at 2/3 height
4. Add three cables (#7) to the horizontal pipe on the first arc (Figure 23).
Figure 23: Reinforcements for plant support system
5. Repeat (add #7 cables) for the last arc.
Installation Manual for Model Alpine-135