PIC-PLAST SOLARIG Alpine 135 Installation Manual page 31

Tunnel kit
Table of Contents

Advertisement

Instructions:
1. Lay out one side net along the length of the structure:
o Centre the net so there is an equal quantity of excess fabric at each end of
the structure. There should be roughly 50cm spare at each end.
o Ensure the 10cm SOLARIG strip is at the top.
o If you have a ventilated side curtain (VSC), ensure it faces outwards.
2. Attach the side nets using the locking profile and self-drill screws (SDS1/4).
3. Stretch the net lengthwise while maintaining the height of the net.
4. The locking profiles have holes that fit the holes on the C-profile.
Figure 25: Side nets
5. Cover the net remaining at the bottom with half of the dirt, stretching the net along
its width and length.
6. Cover with the remainder of the dirt.
Installation Manual for Model Alpine-135
- 31 -
SOLARIG™ TUNNEL KIT