Installation Instructions
2000/2000W/G2-2000 Handrail
Important
1. Acclimate materials 24 hrs
before installation. Maintain
temperature controlled
environment after installation
2. Install in accordance with
manufacturer's installation
instructions. Failure to do so
will void the warranty.
Installation tips
1. Cut covers up to 1/16" (1.6mm)
longer to ensure a tight fit.
2. Lubricate blades when cutting
aluminum to reduce burrs.
CONVENTIONAL
STEEL STUD
(BY OTHERS)
1/4 -20 x 5"
HEX HEAD
SCREW
W/PHILLIPS
HEAD SLOT
Recommended tools
Safety Glasses, Tape Measure, 3/8" socket for machine screw hex bolt, 7/16" socket for wood screw
hex bolt Level, Power Drill, Drill Bits - 1/4" masonry (concrete/concrete block), Power Miter Saw, 1O"
Blade with 60-80 Carbide Tipped Teeth
Installation Hotline • 866.EZINPRO
Inprocorp.com • 800.222.5556 • 262.679.9010
World Headquarters S80 W18766 Apollo Drive, Muskego, WI 53150 USA
3 3/4"
[95mm]
1 1/2"
2 1/4"
[57mm]
[38mm]
1"
CONTINUOUS
[25mm]
ALUMINUM
RETAINER
.080"
1 1/8" SLOTTED
PAN HEAD SCREW
W/SERRATED
FLANGE NUT
MOUNTING
BRACKET
Please read all instructions before installing
handrail.
CONVENTIONAL
STEEL STUD
(BY OTHERS)
1/4 - 20 X 3"
HEX HEAD
SCREW W/
PHILLIPS
HEAD SLOT
VINYL COVER
.080"
[2mm]
1 1/4"
[32mm]
2 13/16"
[72mm]
[2mm]
HANDRAIL HEIGHT
PER LOCAL CODE
SECTION VIEW
3 3/4"
[95mm]
1 1/2"
2 1/4"
[38mm]
[57mm]
VINYL
COVER
.080" [2mm]
CONTINUOUS
ALUMINUM
RETAINER
.080" [2mm]
1 1/4"
[32mm]
1/4" NUT AND
LOCK-WASHER
4 5/8"
[118mm]
STAINLESS
STEEL
MOUNTING
BRACKET
HANDRAIL HEIGHT
PER LOCAL CODE
IPC.335/REV.10