B.A. International BA ULTIMATE POWER+ Series Operating Instructions Manual page 54

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 4
6401553.book Seite 52 Montag, 13. Juni 2016 4:27 16
8 Maintenance
52
Operating Instructions BA ULTIMATE POWER + / BA ULTIMATE
Process
✔ The expiry date of the chuck tester (A) has not elapsed.
1. Insert the chuck tester into the FG clamping system [ → 28].
2. Tighten the chuck tester until the marking ring appears (withdrawal
force: 22 N)
Does the chuck tester slide out of the chuck before the marking ring
appears?
CAUTION! The chuck is defective and the secure fit of the burr
instrument is not guaranteed. This may cause injury!
1. Do not use the product.
Workshop _ BA
2. Have the clamping system replaced by a workshop authorized by
B.A. International.
Tip: Record the time and result of the check for your own information.
64 01 553 D3551.201.03.03.02

Advertisement

Table of Contents
loading

Table of Contents