Delivery And Handling; Delivery Contents; Optional Accessories; Storage - Gebwell T2 Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

4 DELIVERY AND
HANDLING
4.1

Delivery contents

Heat pump
Outdoor temperature sensor
Operating, maintenance and installation manual
Spare seals
Commissioning and warranty protocoll
External source pump, devices T
4.2

Optional accessories

Spare valve
Room sensor
Collector valve group
Pump heating circuit
Heating control group
Cooling control group
SMS/WEB server, SMARTWEB
Buffer accumulator for domestic water
Buffer accumulator for heating
Domestic water control group
Charging package for domestic water
Pool heating set
Diaphragm expansion vessel for collector
Diaphragm expansion vessel for heating
Energy measurement
Fixed fuel boiler control
Additional heat source control
Cooling control
Modbus communication module
4.3

Storage

Before installation, the heat pump must be kept in its
delivery package in a dry and warm location.
4.4

Transport

The heat pump may be temporarily tilted, but it must not
be left inclined for a long period of time, not even in
transit. The heat pump's maximum tilt angle is 20°. It is
not recommended to turn the pump on its side. However,
if there is a need to turn the heat pump on its side, for
transport purposes, for example, the compressor unit must
be removed for the duration of transit. In any case the heat
pump must not be transported on its back. If the heat pump
has been tilted in transit, you must allow the pump to stand
upright for at least two hours before activation so that the
compressor's lubrication oil has time to reach the required
locations. Only lift the heat pump by the pallet. The pump
must be transported on the pallet all the way to the
installation location.
v2-7 24052017
2
2
20-T
32
4.5

Removing the packaging

The product is packaged in protective plastic such that the
installation can be performed without removing the
plastic. The protective plastic can be kept in place to
protect the pump until activation.
Ensure that you have received the correct products
with the correct accessories.
Remove the packaging material, and before
installation, check that the heat pump has not been
damaged during transport. Inform of any possible
transport damage.
Transport the heat pump near the planned installation
location.
Lift the pump off its transport pallet.
Adjust the pump so that it is level and stands firmly
on its adjustable legs.
Ensure that the frame, with the exception of the
adjustable legs, is not in contact with the building's
structures.
4.6

Safety instructions

The following safety instructions are to be taken into
account when handling, installing and using the
equipment.
Turn off the device's main switch before any
maintenance procedures
Never compromise safety by bypassing safety
devices
Only qualified personnel should conduct maintenance
/ repair measures on the cooling unit of the
equipment
The heat pump is not to be flushed with water
Keep all the shell plates in place to prevent water
splashing on the electronic components of the
equipment.
11

Advertisement

Table of Contents
loading

Table of Contents