1 Warning Caution: • Pb free solder has a higher melting point that standard solder; Typically the melting point is 50 - 70 °F (30 - 40 °C) higher. Please use a soldering iron with temperature control and adjust it to 750 ± 20 °F (400 ± 10 °C). In case of using high temperature soldering iron, please be careful not to heat too long.
Page 3
3.2. Trial Operation (after checking Troubleshooting Guide). 3.2.1. Assembly • Confirm if there is no gap between housing A and B by pinching lead wires. • Check that the frequency adjustment dial can be adjusted from 1 to 6. • Mount the blade release lever to the main unit, and confirm that the fixing bolt is securely tightened. •...
4 Disassembly and Assembly Instructions * To reduce the risk of injury, always remove battery pack before removing/installing the tool. * To assemble the tool, start with 8 and proceed to 1. 4.1. Disassembly 1. Remove 4 torx screws. 2. Remove the cover. Note: (When Assembling) Pay attention to avoid pinching of lead wires.
Page 5
5. Remove the rotor assembly. Note: (When Assembling) Mount the rotor assembly to the gear case unit, and then install them to the stator. 6. Remove the fan cover. Note: (When Assembling) The protruding part on the fan cover must be placed on lead wire side.
Page 6
8. Remove the switch nob and display plate from the housing. Note: (When Assembling) Set the frequency adjustment dial at “6”.
5 Exploded View and Replacement Parts List Model No. : EY46A5 Exploded View...
Page 9
Model No. : EY46A5 Parts List Ref. Change Safety Part No. Part Name & Description Q'ty Remarks WEY46A5K3102 HOUSING AB SET WEY46A5K3201 BLADE RELEASE LEVER SET WEY46A5K3301 DISPLAY PLATE WEY46A5K3401 HEAD COVER AB SET WEY46A5L0101 FIXING BOLT WEY46A5L1201 GEAR CASE UNIT...
Need help?
Do you have a question about the EY46A5 and is the answer not in the manual?
Questions and answers