Installation - Abus FUBE50061 Installation Instructions And User Manual

Wireless key switch
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 34

7. Installation

1.
Unscrew the cover bolts with the Allen key provided and remove the
housing cover.
2.
Remove the two fixing screws (4) to the left and right of the black
moulded piece.
3.
Carefully lift the PCB out of the black moulded piece.
4.
Use the rear of the wireless key switch housing as a template and
mark the drill holes (1). Drill the mounting holes.
5.
Only for permanent 12 V power supply: guide the connection cable
through the opening provided (2).
6.
Affix the housing to the wall.
7.
Install the half cylinder (5): insert a key into the half cylinder (5) and
turn the locking nose using the key until the half cylinder (5) can be slid
into the bracket. Now affix the half cylinder (5) using the fixing screw
(6). Then check whether both buttons can be activated using the
locking nose.
8.
Only for permanent 12 V power supply: connect the cable to the
correct pole of the terminal block (8). The terminal block poles are
labelled accordingly. Ensure that stripped sections of unused cable
wire do not come into contact with the PCB.
9.
Re-insert the PCB, ensuring that the spring for the wall sabotage
switch (9) is correctly positioned. Then screw in the two fixing screws
(4) to the left and right of the black moulded piece.
10. Insert the battery provided into the battery holder (7), ensuring the
polarity is correct. If a permanent 12 V power supply is being used, you
do not require a battery for the wireless key switch to function. When a
12 V supply voltage is detected, the battery is automatically
disconnected. You can, however, use the battery as a back-up
power source, as the wireless key switch automatically switches
to battery operation mode if the 12 V power supply is interrupted.
11. Now proceed with section 8. If you do not want to use the switch for all
four partitions, and do not want to use the administrator code "1234",
program the wireless key switch in accordance with sections 8.5 and
8.3. Follow section 8.6 to pair the wireless key switch with your
Secvest wireless alarm panel. In operating mode 1, the Secvest
wireless alarm panel is also operated using the wireless key switch.
Also note the information in sections 8.2, 8.4 and 8.7.
12. Place the parts of the core extraction protector on the cylinder.
13. Ensure that the spring for the cover sabotage switch (10) is in the
correct position, and that the O-ring is lying flush in the housing
groove. Replace the housing cover and tighten the cover bolts.
14. Now proceed with section 9.
EN 10

Advertisement

Table of Contents
loading

Table of Contents