Download Print this page

Advertisement

Quick Links

INSTALLATION AND CARE INSTRUCTIONS
THESE INSTRUCTIONS MUST BE READ BEFORE INSTALLATION IS ATTEMPTED. FAILURE TO DO SO MAY COMPROMISE WARRANTY. FOLLOWING
INSTALLATION PLEASE LEAVE ALL PAPERWORK WITH CLIENT AS IT CONTAINS IMPORTANT INFORMATION ON HOW TO UNDERTAKE ONGOING
CARE FOR YOUR MACERATOR PUMP TOGETHER WITH WARRANTY PAPERS.
1. Description
- THIS UNIT IS FOR DOMESTIC USE ONLY
The Macerator Pump is a compact macerator pump designed to receive and pump away sewage waste and water from one standard P-trap WC
pan, shower, vanity and bidet.
The Macerator Pump will activate automatically following ush of your WC or in ow from either of vanity xtures attached.
Please pay particular attention to the following:
Possible danger to personnel
"ATTENTION" This is a general warning that failure to follow instructions could result in poor functioning of the unit.
This pump bene ts from the latest technological innovations concerning soundproo ng. To bene t fully from the advantages provided by
this new generation of appliances, it is important to comply with the installation instructions in section 5, 6 and 7.
2. List of Accessories included
x1
A
Discharge elbow
E
Smaller
diameter
towards
pump
casing
Inlet Connector
J
Blanking o inlet cap
PAGE 1
MACERATOR PUMP
B
Hose clip
x3
F
Hose clip
x1
K
Smaller
diameter
towards
pump casing
Pan Collar and Cable Tie
Warning of possible electrical hazard
x8
C
32 x 55
Hose clip
x1
G
90 x 110
Floor mounting bracket
x1
x1
D
25 x 40
Hose clip
x2
H
Foam feet
x1
20 x 32
x4

Advertisement

loading

Summary of Contents for Saniflo MACERATOR PUMP

  • Page 1 1. Description - THIS UNIT IS FOR DOMESTIC USE ONLY The Macerator Pump is a compact macerator pump designed to receive and pump away sewage waste and water from one standard P-trap WC pan, shower, vanity and bidet. The Macerator Pump will activate automatically following ush of your WC or in ow from either of vanity xtures attached.
  • Page 2: Macerator Pump

    MACERATOR PUMP 3. Dimensions and overall measurements 4. Performance curve USE ONLY Ø 20MM PRESSURE PIPE FOR VERTICAL LIFT 100 110 OUTPUT (litres/min) 5. Vertical and horizontal pumping parameters 5m max All elbows must be 2 x 45˚ 1:100 All horizontal...
  • Page 3: Installation

    • The Macerator Pump must be coupled directly to the spigot (outlet) of the WC pan. • The Macerator Pump must be located on the same fl oor level to that of all incoming fi xtures. Do not locate in a pit or in-ground opening.
  • Page 4 MACERATOR PUMP Connections - Extra sanitary appliances Plugging side inlet Closed See gs 1 and 2 for connections that may be required for extra xtures. PAGE 4...
  • Page 5 Attach the inlet connector to the top entry using the metal hose clip (B), and use another hose clip (B) to attach to MACERATOR PUMP the incoming waste pipe. The small diameter faces the pump lid, the larger diameter accepts incoming waste line.
  • Page 6 MACERATOR PUMP Vertical before horizontal 1:100 Air Admittance Valve 20mm Ø 25mm 1:100 Connections - Venting • Where possible venting should always be made in a manner consistent with common plumbing practice venting requirements referred to in Australian Standards AS 3500 10:10 & 6:7:4.
  • Page 7: Electrical Connection

    DO... DO... periodically clean the Macerator Pump with a basic household detergent cleaner ie domestos, pine o clean or actizyme. DO... previous operation, sooner rather than later.
  • Page 8 DO NOT... use Blu Loo or similar products with your Sanipro as this may cause the pump to cavitate. Cavitation occurs when there is an excessive build of of foam or froth from detergents; this may cause motor damage. DO... DO... periodically clean the Macerator Pump with a basic household detergent cleaner ie domestos, pine o clean or actizyme. MACERATOR PUMP DO...
  • Page 9 MACERATOR PUMP 14. Parts White casing PAGE 9...
  • Page 10 MACERATOR PUMP 15. Ten golden rules for correct installation 1:100 Ball Value All horizontal pipes should have a minimum fall of 1:100. If a vertical rise is needed, this should be at the start of the run Discharge pipework should be solvent UPVC.