Test Run The Whirlpool - Kohler K-1106 Installation Manual

Flanged 120 v bath whirlpool
Hide thumbs Also See for K-1106:
Table of Contents

Advertisement

Available languages

Available languages

Fill with water at least 2" (5.1 cm)
above the highest jet.
Turn the jet trim ring
clockwise to
decrease the flow.
Turn the jet trim ring counterclockwise
to increase the flow.

9. Test Run the Whirlpool

Check all electrical connections, and make sure the electrical power to the whirlpool and heater (if
equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation."
1011092-2-E
Position the jet
nozzles to direct
the water flow as
desired.
12
Press the air switch to turn the
whirlpool on or off.
Kohler Co.

Advertisement

Table of Contents
loading

Table of Contents