Download Print this page

Alpha ESS M4856-P Quick Installation Manual page 5

Battery module
Hide thumbs Also See for M4856-P:

Advertisement

Wiring
Step6
Battery power cable connection sequence:
Go through the waterproof cap→ go through the sealing ring→ go
through the joint, fixed to the copper bar with M5 nut inside of the
battery.
7
8
Battery connector:
Positive power cable (x1)
Battery communication
Negative power cable (x1)
10
11
Corrugated pipe (x1)
Cable tie (X 6)
9
Hexagon nuts with flange
cable (X 1)
M5(X 10)
Battery power cable connection sequence:
Go through the waterproof cap→ go through the sealing ring→ go
through the joint, fixed to the copper bar with M5 nut inside of the
battery.
The waterproof connector is rotated counterclockwise
1
according to the installation procedure to remove the plug.
Use a screwdriver to remove the maintenance cover
2
before wiring.
All air switchs are set to disconnect at the factory.Please
3
check before wiring.
The waterproof joint seal should be
4
confirmed whether it is inserted into
the plastic claw ring during installation.

Advertisement

loading