TYPICAL INSTALLATION

WIRING
BLACK
TO
BLACK
WHITE
TO
WHITE
Ventilator can be wired from outside of housing.
Use UL approved connectors to wire per local codes.
DUCTING (Horizontal blower discharge)
ROUND
ELBOW*
Two ways to connect ductwork to a factory-shipped unit.
* L100 & L150 Series uses 6" Round Duct.
L200, L250, & L300 Series uses 8" Round Duct.
IMPORTANT:
Remove shipping tape from damper
Remove the shipping tape from the damper flap and make sure that
damper flap opens and closes freely inside the ductwork. Use duct
tape to make ductwork connections secure and air-tight.
Remove shipping ring from blower inlet
Remove the shipping ring from the blower inlet before operating
the ventilator.
TOP / BACK
OF HOUSING
GROUND TO
WIRING PLATE
WIRING
PLATE
LINE IN
ROOF CAP
ROUND
DUCT*

MOUNTING OPTIONS

¼-20 hex nuts secure mounting brackets to housing. Loosen and
re-tighten or remove and replace nuts as necessary for desired
mounting bracket position.
Mounting brackets in
ADUSTABLE FOR VARIOUS CEILING THICKNESSES
factory-shipped position.
(Outlet parallel to joists.)
(New construction)
Mounting brackets mounted
INSTALLATION WITH DUCTWORK
RUNNING ACROSS JOISTS
to outlet sides of housing.
(Outlet perpendicular to joists.)
(New construction)
Mounting brackets mounted
ADUSTABLE FOR VARIOUS CEILING THICKNESSES
to top of sides of housing.
(Outlet parallel to joists.)
(New or existing construction)
WALL
CAP

WIRING OPTIONS

WIRING PLATE
POSITION
HORIZONTAL POWER
CABLE CONNECTION
Wiring plate mounts to side or top of housing.
2
1
/
"
1
8
MAX.
12¼"
Mounting brackets flipped
INSTALLATION FROM ABOVE FINISHED CEILING
over and mounted to outlet
(Outlet parallel to joists.)
12¼"
Mounting brackets flipped
ADUSTABLE FOR VARIOUS CEILING THICKNESSES
over to give approx. 1"
(Outlet parallel to joists.)
/
9
1
"
2
to
10
/
"
1
2
12¼"
Mounting brackets flipped
INSTALLATION FROM ABOVE FINISHED CEILING
over and mounted to top of
(Outlet parallel to joists.)
(New or existing construction)
1½"
to
2½"
12¼"
sides of housing.
(Existing construction)
1
/
"
1
2
to
2
1
/
"
2
12¼"
more clearance.
(New construction)
/
10
3
"
4
to
11
/
"
3
4
12¼"
sides of housing.
VERTICAL
POWER CABLE
CONNECTION