Maintenance; Safety Instructions; Weekly Maintenance - Martin DT2H Installation Manual

Main scraper
Table of Contents

Advertisement

5
5.1
5.2
© Martin Engineering GmbH

Maintenance

Safety instructions

NOTE
Maintenance inspections should take place at least once a week.
Depending on operational conditions, shorter maintenance inter-
vals may be necessary.
NOTE
Read this section thoroughly before beginning any work.
WARNING! DANGER OF INJURY!
Body parts and/or clothing may get caught and pulled in by rotat-
ing parts or by the moving conveyor belt.
Before maintenance work is carried out, ensure that all power
sources to the conveyor belt system and its accessories are
switched off and secured against inadvertent reactivation.
Use warning signs!

Weekly maintenance

1. Switch off the power supply of the conveyor belt and any other
equipment and secure them against being switched on inad-
vertently.
2. Remove all material deposits from the cleaner blade and the
main axle.
3. Check that all securing parts are tightened. Tighten loose con-
nections, if any.
4. Check the tension of the scraper and tighten it if necessary.
5. If there are any signs of malfunctions, turn off the relevant parts
of the conveyor belt system. To get support, contact Martin En-
gineering or one of its representatives. DO NOT operate the
conveyor belt system until the reason for the problem has been
identified and resolved.
6. Check if the scraper blades are worn, damaged and parts miss-
ing.
7. If the hard metallic inserts are worn out, replace the blade ac-
cording to the instructions in section 5.3.
23
M3699UK-11/13

Advertisement

Table of Contents
loading

Table of Contents