Installation preparation

Before installation

Materials and tools required

In addition to the standard tools, the following special instruments
may be needed for installation and maintenance.
• Lifting equipment with a capacity greater than the weight of
the main scraper (note the weight on the delivery note).

Preparatory measures

NOTE
Pay attention to the following checks and carry them out comple-
tely.
The freight forwarder is responsible for any transport damage!
For any damage claims, please contact the freight forwarder.
1. At the time of delivery, check the following points:
• Is the delivery complete? Is the number of pallets / cases /
containers the same as the number on the delivery note?
• Does all the transport packaging appear to be undamaged?
Is there damage which may indicate that the contained
products may be damaged?
2. If the delivery is incomplete or if there is transit damage, make
sure to record this and have it confirmed by the freight forwar-
der. All damaged products should be saved for inspection.
3. Depending on the scope of the order, the delivery should con-
tain the following parts:
• MARTIN
DT2H main scraper with tensioner (spring or air
®
tensioner).
• Installation manual.
• Two warning labels for conveyor belt products,
part no. 23395G
• Two warning labels for crushing hazard, part no.: 30528G
• Two warning labels for reversible tensioner,
Part no. 37827
4. Missing or damaged parts should be reported to Martin Engi-
neering or the authorized dealer.