Download Print this page

Wieland gesis EIB V Series Installation Instructions page 2

Advertisement

.....
I m p o r t a n t n o t e
Assembly of switching devices
Connectors must audibly latch into place when
they are plugged in
All cables must be fixed and supplied with a suffi-
cient strain relief
The devices must be protected against damp, dirt
and from being damaged
The devices may not be operated outside the spe-
cific technical data
The appropriate standards, guidelines, regulations
and conditions for setting up electrical installations
should be complied with as well as the relevant
safety specifications
P 7
Supply: Mains connection (socket), 5 pole (L1, L2, L3, N,
PE)
P 8
Supply: Bus connection (socket), 2 pole (+, -)
P 9
Routing: Mains / EIB combination connector (plug)
5 / 2 pole (L1, L2, L3, N, PE / +, -)
P 10 Routing: Mains (plug), 5 pole (L1, L2, L3, N, PE)
P 11 Routing: EIB (plug), 2 pole (+, -)
P 12 Routing: EIB (plug), 2 pole (+, -)
P 13 Slot (12 x 5.5 mm) for fixing the switching device with a
countersunk screw. Recommended screws: 4.5 x 40 mm
countersunk screws when using 6 mm plastic plugs
P 14 Hinged clip for securing the plug-and-socket connection
P 15 Supply plug integrated into the switching device
Both the single-phase devices
three-phase devices
connection
P 16 LED for displaying the programming state
P 17 Push button for setting device to programming state
P 18 Labelling field for the physical address
P 19 Slot (7.5 x 5.5 mm) for fixing the switching device with a
countersunk screw. Recommended screws: 4.5 x 40 mm
countersunk screws when using 6 mm plastic plugs
P 20 Switching device
P 21 Fixing possibilities on the switching device for leading the
extension cables via the switching device
P 22 Sockets integrated in the switching device for connecting
consumer loads. The number of poles and the terminals
are the same as for the output connectors P1
Assembly using
flat cable P4
1. Enter the physical address on labelling field P18.
2. The device should possibly be preprogrammed with a
programming layout consisting of a power supply and an
interface.
3. Attach the flat cable adapter P5 to the flat cable P4, while
observing the installation instructions for the flat cable
adapter.
4. Snap the locking device P3 into place in the flat cable adap-
5. Open the fixing clip P14 for the supply cable as indicated
6. Latch the flat cable adapter tight into the appliance connec-
7. Fix the switching device in the required position using
8. Close the fixing clip P14 again since is not required for this
Assembly using
round cables
9. Enter the relevant physical address on the labelling field
10. The device may possibly need to be preprogrammed with
11. Open the fixing clip P14 for the supply cable as indicated
12. When using P6 or P7 without a distribution block P12, snap
gesis
and the
EIB V-0/4 1PH
13. Latch the supply cable P6 or P7 and P8 or the distribution
gesis
have a 5 pole mains
EIB V...
14. When using the distribution block P12, snap the supply
15. Latch the fixing clip P14 again.
16. Snap any extension cables into place in the distribution
17. Any cables for further connection beyond the switching
gesis
EIB....
Opening the fixing
clip P14
Pull the fixing clip out-
wards on the side
with the arrow (1), lift
slightly (2) and then
swivel by 90°. If it
needs to be removed
completely, it should
be pulled from the
opposite side (1) and
removed.
C a u t i o n
Before assembling the flat cable adap-
ter P5, ensure that the flat cable P4 is
de-energized.
ter P5.
below.
tor P15.
countersunk screws via the slots P13 (12 x 5.5 mm) and P19
(7 x 5.5 mm). (drilling distance 230 mm x 64.5 mm)
variant.
P18.
a programming layout consisting of a power supply and an
interface.
below.
the interlocking clip P2 into place.
block P12 into the switching device.
cables P6 or P7 and P8 into place in the distribution block.
board P12.
device can be fixed in P21 as shown.
2
3
1
Release variant 1
g
For freely accessible
latch mechanisms
Place the screwdriver
on the interlocking clip
(1), as for example bet-
ween the distribution
block P12 and the sup-
ply connector P6 or the
output connector P1
with the switching devi-
ce P20, and disengage
by
lifting
the
latch
mechanism (2) while
simultaneously separa-
3
ting
the
plug-and-
socket connection (3).
Release variant 2
For inaccessible latch
mechanisms
Place the screwdriver
(1) at the side between
the connector and the
relevant
interlocking
clip, as for example bet-
3
ween
the
switching
device P20 and the
supply plug-and-socket
connections P5, P6, P7
or P12 and lift the lat-
ching device (2). The
connection is disenga-
ged by simultaneously
separating the connec-
tor (3).
Dismantling when using
flat cables P4
C a u t i o n
Before dismantling the flat cable
adapter P5, ensure that the flat cable
P4 is de-energized.
18. Remove the output connector P1 as indicated for release
variant 1.
19. Open the fixing clip P14 as indicated above.
20. Unscrew the switching device by loosening the counter-
sunk screws (P13 and P19).
21. Remove the flat cable adapter P5 from the switching device
as indicated for release variant 2.
22. If necessary, unscrew the flat cable adapter P5 from the flat
cable, while taking into account the installation instructions.
23. If a flat cable adapter is no longer to be attached, the
piercing holes should be sealed with a few twists of insu-
lating tape.
1
2
1
2
g

Advertisement

loading

This manual is also suitable for:

Gesis eib v-0/2 +1wGesis eib v-0/2sdGesis eib v-0/4Gesis eib v-0/2wGesis eib v-0/2 + 1w 1phGesis eib v-0/4 1ph ... Show all