3. Pull the release latch to the fully-open position as shown in the illustration.
The module moves out of the bay slightly.
I/O module
4. Slide the module out of the bay and set it aside.
5. Place either another I/O module or a filler module in the bay within 1
minute.
6. If you placed another copper pass-thru module in the bay, reconnect any
cables that you disconnected in step 2 on page 20.
7. Replace the acoustic-attenuation module option, if you removed it in step 1
on page 20.
!