Crown CEM-1515 Instruction Manual page 4

Table of Contents

Advertisement

pump water, when there is water flowing out and close the pump by pressing the pump control button again
STO P
to the "
" position, make sure the coffee/steam button is on the higher position which is the
and waiting for a moment, the appliance begins to be pre-heated until the ready indicator (green) is
illuminated, it shows the pre-heating is finish. Pressing the pump to the lower position which is the "
position again, and water will flow out.
6. After water not dropping out any more, you can pour the water in each container out then clean them
thoroughly, now you can start brewing.
Note: There may be noise when pump the water on the first time, it is normal, the appliance is releasing the
air in the appliance. After about 20s, the noise will disappear.
PRE-HEATING
To make a cup of good hot Espresso coffee, we recommend you preheating the appliance before
making coffee, including the funnel, filter and cup, so that the coffee flavour can not be influenced by
the cold parts.
1.
Remove the detachable tank and open the tank cover to fill it with desired water, the water level
should not exceed the "MAX" mark in the tank. Then place the tank into the appliance properly.
2. Set steel mesh into metal funnel, make sure the tube on the funnel aligns with groove in the appliance,
then insert the funnel into the appliance as indicating of "Insert" mark, and you can fix them into
coffee maker firmly through turn it anticlockwise until it is at the lock position.(See fig. 1).
3. Place an espresso cup (yourself cup) on removable cup shelf.
4. Then connecting the appliance to power supply source. Make sure the steam control knob is on the
minimum position.
5. Press the
ON/OFF
will be illuminated, make sure the coffee/steam button is on the higher position which is the
position. Press down the pump control button to the lower position which is the "
there is water flowing out, close the pump immediately by pressing the pump control button again to
the higher position of "
housing.
6. When the ready indicator (green) is illuminated, you should press down the pump control button to the
lower position which is the "
indicator (green) is extinguished, close the pump by pressing the pump control button again to the
higher position of "
MAKE ESPRESSO COFFEE
1. Remove the funnel by turning it in clockwise, .Add ground coffee to
steel mesh with measuring spoon, a spoon ground coffee power can
make about a cup of top-grade coffee, then press the ground coffee
powder tightly with the tamper.
button to the lower position which is the "
STO P
". The purpose of the step is that pump the water of the tank into the
" position again, there will be hot water flowing out. When the ready
STO P
". The pre-heating is finished.
" position, the power indicator (red)
" position, when
position
"
Fig.1

Advertisement

Table of Contents
loading

Table of Contents