Offset Through Floor/Ceiling - Superior CUSTOM SERIES RD-36 Installation Instructions Manual

Custom series 36" wood burning fireplaces
Table of Contents

Advertisement

Note: If there is a room above ceiling level,
firestop spacer must be installed on the bottom
side of the ceiling. If an attic is above ceiling
level, firestop spacer must be installed on top
side of ceiling joist (Figures 21 and 22 ).
Room Above
Figure 21
Attic Above
Firestop Spacer
Figure 22
CHIMNEY 30 OFFSET THROUGH FLOOR
OR CEILING
It may be necessary to assemble the chimney at
30 when passing through the floor or ceiling
area. Use the F8FS30-2 firestop spacer as shown
in Figures 23 and 24 . Support the chimney at
floor or ceiling penetration with a FTF8 stabi-
lizer if distance of chimney below ceiling is 10'
or more. Maintain 2" minimum air space to
combustibles from chimney sections.
Attic Space
F8FS30-2
Firestop Spacer
FTF8-S4 Stabilizer
2" Min.
Air Space
10'
Max.
Figure 23
F8FS30-2
Firestop Spacer
2" Min.
Air Space
Figure 24
Firestop Spacer
For Canada Only
When installing the chimney system through
an open attic space, the attic shield assembly-
firestop spacer must be used ( Figure 25 ). This
installation is required only for use in Canada.
Open Attic Space
Figure 25
Note: For Canadian installations, all chimney
installed outside the building must be constructed
with galvalume (outer sections only) effective
January 1, 1992. The appropriate model desig-
nations are located in the back of this manual.
Step 4. Note: Chimney sections are constructed
with a unique locking tab design, which en-
sures an immediate, tight assembly between
sections. Plan your chimney requirements
carefully before assembly as chimney is diffi-
cult to disassemble after installation. If disas-
2" Min.
sembled, the tabs might become damaged. Be
Air Space
certain tabs are properly formed to ensure
locking tabs engage properly.
The Security FTF8 chimney system is a two
piece chimney, which snap together from
the fireplace up. Start with the inner flue
section with the lanced end up, snap lock it
30 Firestop
in to the matching collar on top of the fire-
And Attic Above
place. At all subsequent joints, the upper
flue section fits into the preceding flue sec-
tion. Each piece snaps together by means of
locking tabs (9 locking tabs per joint). Check
each piece by pulling up slightly from the top
to ensure proper engagement before installing
the next section.
NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.
Room Above
2" Min.
Air Space
FTF8-S4 Stabilizer
30 Firestop
10'
Max.
And Room Above
If the flue has been installed correctly, it will not
separate when you test it. Also, the inner flue
joint where each section is joined should be
tight and flat without gaps ( Figure 26 ).
Figure 26
Outer pipe section installs in just the opposite
way; the lanced end goes down and each new
section goes OVER the outside of the previous
section installed ( Figure 27 ).
Figure 27
Note: Assemble one component of chimney at a
time (inner section first, then outer section last)
before proceeding with the next complete section.
Continue to assemble the chimney up through
framed opening. Assemble just enough to pen-
etrate the roof flashing openings ( Figure 28 ).
Always maintain 2" minimum air space to com-
bustible materials and always check each chim-
ney joint (inner and outer) to ensure proper
engagement. Check vertical alignment of chim-
ney so that it projects from the roof in true
vertical position.
2" Min. Air Space
To Combustibles
Figure 28
Locking
Tabs
(Lances)
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rd-36-hRdi-36Rdi-36-hHc-36Hc-36-hHci-36 ... Show all

Table of Contents