Fixation Of The Assembly - Barco VRWF-3200 System Installation Manual

Vr workroom
Table of Contents

Advertisement

How to mount the safety cable ?
1. Pass the two extremities through the two holes (see image below). Pass the second cable as shown on the image. The cables
can now be attached to an appropriate, stable, fixed object (top part of the ceiling mount) once the assembly has been lifted at
its final position. (image 5-9)
Image 5-9
5.2.4

Fixation of the assembly

Safety precautions !
W
ARNING
W
ARNING
W
ARNING
W
ARNING
How to lift and fix the assembly ?
1. While 2 persons pull on the cords and lift the projector, 2 other persons hold the assembly into position until the screwed rods
pass through the fixation holes on the lower supports. (image 5-10)
R5976989 BARCO VR WORKROOM 22/09/2006
:
Never stand under the lifted projector !
:
Lifting of the projector has to be done slowly and by avoiding swaying !
:
When lifting the assembly always take the necessary precautions !
:
Persons not involved with the installation, must be kept out of the installation area !
5. Mechanical Installation
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrwr-3200Vrwf-3201Vrwr-3201Vrwr-3202

Table of Contents