Download Print this page

Globalstar SmartOne LP Quick Start Manual

Managed asset tracker

Advertisement

Quick Links

Globalstar SmartOne LP
Managed Asset Tracker – Quick Start Guide
1.
Remove mounting and battery housing plates.
2.
Install Qty 4 Energizer ultimate lithium AA 1,5v batteries (or equivalent) lithium
batteries see Battery Specifications.
3.
IMPORTANT: The antenna is mounted on the same side as battery housing and
MUSTface towards the sky.
This side MUST 
face towards 
the sky 
Batteries 
4.
Once the batteries have been installed the SmartOne can be mounted in its
operational location.
5.
The SmartOne unit is shipped in the off position.
Off 
Position 
© Wireless Innovation Ltd 2012
Battery Housing 
Plate
SmartOne LP Quick Start
AUGUST 2012
Mounting 
Plate 

Advertisement

loading

Summary of Contents for Globalstar SmartOne LP

  • Page 1 Batteries  Battery Housing  Plate Once the batteries have been installed the SmartOne can be mounted in its operational location. The SmartOne unit is shipped in the off position. Off  Position  © Wireless Innovation Ltd 2012 SmartOne LP Quick Start AUGUST 2012...
  • Page 2 15 years at 21°C Transportation: For complete details, please reference: Global (exept US): Special Provision A45 of the International Air Transportation Association Dangerous Goods Regulations. United States:49 CFR 173.185 © Wireless Innovation Ltd 2012 SmartOne LP Quick Start AUGUST 2012...