All installations and services must be performed by qualified service personnel.
4.
BLOWER AND CONTROL PANEL WIRING
: TURN OFF THE ELECTRICAL POWER to the furnace before attempting to disconnect
blower wiring.
DIP SWITCH (S1):
HEAT "OFF" DELAY
SW1
ON
OFF
*ON
OFF
ND
2
STAGE DELAY FOR SINGLE STAGE
THERMOSTATS
SW3
OFF
*ON
*Factory Setting
Figure 21
SW2
SECS.
ON
60 SEC.
ON
90 SEC.
OFF
120 SEC.
OFF
180 SEC.
MINUTES
5 MIN.
10 MIN.
27