Download Print this page
Emerson HFT2900 FP Installation Instructions And Mounting Template
Emerson HFT2900 FP Installation Instructions And Mounting Template

Emerson HFT2900 FP Installation Instructions And Mounting Template

Advertisement

Quick Links

Model HFT2900
FP Installation
Instructions
and Mounting Template
This product
must be installed
by a qualified
heating
and air conditioning
contractor.
Failure
to do so could result in serious
injury from electrical
shock.
installation
Options
_s hurn_,o,s,ou,_
no, b e,_t_,ed whe_
t emperatures
CO_Led
exceed 180 = F.
A.
A. Mount the humiditier to the
vertical wall of the warm alr
plenum only,
B. The White-Rodgers
Model
HFT2gO0 should be inslaJIed as
.shown in reIa].ion 1o AC cooling
coils.
installation
instructions
1,Tape
the te.mplate onto the
furnace plenum, making
sure
it Is level,
Trace the four corners onto the
ptenum,
Remove the temptate from the
plenum and draw _ines connecting
the tour corne_s,Accurately
cut
the plenum opening,
2.
D/set,gage the l_mid_er
ocher frorn the mounling frame by
rotating the thurnb screw localad a!
the bottom or the _
T_I and I_ff.
the cover off the frm_,
Pull outthe ddp tr_¢ and evaporator
pad assembly by grasping the f.op
tip and tipping ot.-'t.
_, Caution
Template
Must
Be Level
3.
Place lhe mounting frame into
the plenum opening so that the
fi'arne hooks over the bottom of the
cut-out plenum opening. S_acur_
the _
with the screws provided.
4. Reinstall the evaporator pad
and drip Ira','.
Real{ech the cover assembiy by
hooking it el the lop of the mount-
ing frame first, then secuflng wilh
thumb screw at the bollern.
5. Locate and install f_hahumidistat
kit by follow_ng the detailed instruc-
tions tn the partsbag.

Advertisement

loading