Download Print this page

Ecoboil EBE Express Series Installation And Maintenance Instructions page 3

Automatic under bench water boilers

Advertisement

c. Connect the 5/16" pipe from the tap to the boiler outlet.
d. Connect the 1/4" pipe from the tap to the Mains water supply
using the 350 kPa PLV and brass connectors supplied.
e. Push the end of the silicon tube on to the vent pipe of the unit.
5. All pipes and tubes must not be extended and require a
continuous fall between tap and unit.
6. Open tap until water is flowing from the spout.
7. Once water flows out of the tap, plug in the unit to a standard 3
Pin 10 Amp Power Socket and switch on the power. Make sure
the unit is positively earthed.
8. After the power is turned on allow 20 minutes before testing and
using.
9. Check for leaks at all connections.
10. Position 'Caution Boiling Water' label close to the tap to alert
users to the water temperature.

Advertisement

loading