Be careful not to cause the ship kit to fall off as you are lifting the box.
Remove the accessory and rail kit boxes.
6.
Preserve and retain packaging.
7.
Be sure to inspect each piece of equipment shipped in the packing box.
8.
If anything is missing or damaged, contact your supplier.
www.nvidia.com
NVIDIA RTX Blade Server
Installation and Setup
DU-09554-001 _v02 | 9
Need help?
Do you have a question about the RTX BLADE SERVER and is the answer not in the manual?
Questions and answers