Allume SolShare Installation Manual

Hide thumbs Also See for SolShare:

Advertisement

Quick Links

SolShare
Installation Manual
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SolShare and is the answer not in the manual?

Questions and answers

Summary of Contents for Allume SolShare

  • Page 1 SolShare Installation Manual...
  • Page 2 The technical instructions and illustrations contained in this manual are to be treated as confidential and no part may be reproduced without the prior written permission of Allume Energy and end users may not divulge the information contained herein or use this manual for purposes other than those strictly connected with correct use of the equipment.
  • Page 3: Table Of Contents

    II/ Mounting the SolShare A. Installation site selection B. Installation III/ Electrical connection A. Input / Output connections B. Output connection to main switchboard C. Running current transformer tails D. Current transformers to SolShare connections E. Current transformer clipping F. Launch the SolShare...
  • Page 4 SolShare. If you have questions or feedback on the product or this manual, feel free to reach out to Allume on +61 394 270 005 and ask for a technical representative. Otherwise, you can...
  • Page 5: Commissioning Document

    Commissioning Document To be completed during installation Installer name: Company: Serial Number: Installation Address: State: Postcode: Country: Unit Connection Identifier Unit Connected (eg: Apt 1, Unit B, Common light & power, No connection) SolShare Connection Single-Phase Three-Phase...
  • Page 6: I/ What's In The Box

    I/ What’s in the box Check for Transport Damage Make sure the SolShare is intact following transportation. If there are any signs of visible damage, please contact your dealer immediately. Carefully check that all of the components have been supplied. If anything is missing, contact your dealer.
  • Page 7 5 three-phase units (or a combination of the two). SolShare and each unit’s main switch. This allows for the isolation of the SolShare and the solar supply of The SolShare takes a single three-phase input from a any of the connected units.
  • Page 8: Ii/ Mounting The Solshare

    II/ Mounting the SolShare A. Installation site selection To minimise cabling required, the SolShare should be and that it is mounted at a convenient height. Please mounted as close to the main switchboard (tenancy ensure the following mounting requirements are also isolator board) as possible.
  • Page 9: Installation

    30kg shear force per fastener. Important: - The mounting wall and fastener selection is at the discretion of the installer. Allume Energy take no responsibility in the appropriate site selection of the SolShare or the appropriate bracket fastener choice.
  • Page 10: Iii/ Electrical Connection

    Box as you find it, closed. Unscrew the 4 screws To reveal the lower section, slide cover up about on the underside of the SolShare to allow access to 15cm. Whilst sliding cover upwards, pull cover gently connection terminals. Retain screws to replace later.
  • Page 11 To wire the input cable and output cables into 5. Cut and connect phase cables as per the diagram above. the SolShare the following steps should be taken: Important: Label the tail of the cable to ensure the correct cable is wired into the correct unit in the main switchboard.
  • Page 12: Output Connection To Main Switchboard

    X X X X X X X X X X X X 10 11 12 13 14 15 A solar isolator must be installed between the SolShare switchboard. If positioned seperately, ensure clear output and unit main switch for each participating unit.
  • Page 13: Running Current Transformer Tails

    X X X X X X 10 11 12 13 14 15 Unit main switches 1. Run conduit from Solshare to main switchboard. (conduit gland is rightmost membrane gland on underside of SolShare) 2. Label tails and head of current transformers (CTs) as per the solar cable labels in the previous step (see figure on the right).
  • Page 14: Current Transformer Clipping

    Before commissioning re-check all CTs and output cables are connected as per their labels. To commission the SolShare: 1. Pull down cover of SolShare. Fasten shut by replacing the 4 screws on the underside of the SolShare, that were removed in section III/A.1.