Download Print this page

Intertek Jøtul GI 535 DV IPI Fuel Conversion Instructions

Propane fuel conversion kit and natural gas fuel conversion kit

Advertisement

Quick Links

NOTE: IN ORDER TO EASILY ACCESS THE
STEPPER MOTOR COMPONENTS, COMPLETE
THE FUEL CONVERSION PROCEDURE BEFORE
PLACING THE INSERT WITHIN THE FIREPLACE.
This conversion kit shall be
installed by a qualified service
agency in accordance with the
manufacturer's instructions and all
applicable codes and requirements
of the authority having jurisdiction.
If the information in these
instructions is not followed exactly,
a fire, explosion, or production
of carbon monoxide may result
causing property damage, personal
injury or loss of life. The qualified
service agency is responsible for
the proper installation of this kit.
The installation is not proper and
complete until the operation of
the converted appliance is checked
as specified in the manufacturer's
instructions supplied with the kit.
CAUTION: Before proceeding with
this conversion, the gas supply must
be shut off prior to disconnecting
the electrical power.

Fuel Conversion

Cet équipement de conversion sera
installé par une agence qualifiée
de service conformément aux
instructions du fabricant et toutes
exigences et codes applicables de
l'autorisés avoir la juridiction. Si
l'information dans cette Instruction
n'est pas suivie exactement, un
feu, explosion ou production de
protoxyde de carbone peut résulter
le dommages causer de propriété,
pert ou blessure personnelle de vie.
L'agence qualifiée do service est
esponsable de l'installation propre
de cet équipemetn. L'installation
n'est pas propre et complète jusqu'à
l'operation de l'appareil converi est
chéque suivant les critères établis
dans les instruction de propriétaire
provision nées avel l'équipement.
ATTENTION: Avant de procéder à cette
conversion, l'approvisionnement en
gaz doit être coupée avant de dé-
brancher l'alimentation électrique.
Jøtul North America, Inc. 55 Hutcherson Dr. Gorham, Maine 04038
Instructions
Kit 157784 - NG to LP
Kit 157785- LP to NG
2 / 17 139777_R02

Advertisement

loading

Summary of Contents for Intertek Jøtul GI 535 DV IPI

  • Page 1: Fuel Conversion

    Fuel Conversion Instructions Kit 157784 - NG to LP NOTE: IN ORDER TO EASILY ACCESS THE Kit 157785- LP to NG STEPPER MOTOR COMPONENTS, COMPLETE THE FUEL CONVERSION PROCEDURE BEFORE PLACING THE INSERT WITHIN THE FIREPLACE. This conversion kit shall be Cet équipement de conversion sera installed by a qualified service installé...
  • Page 2 Fuel Conversion Fuel Conversion Procedure 1. Use the Latch Tool to shut off the gas supply by closing The Jøtul GI 535 DV IPI is shipped from the factory the gas cock. Fig. 1. equipped to burn Natural gas. Propane Fuel 2.
  • Page 3 Pilot Assembly Rear Burner Injector Rear Burner Air Shutter Cable Front Burner Injector Front Burner Air Shutter Cable Air Shutter Adjustor Trays Figure 1. Insert the Latch Tool into the receiver Figure 2. Fuel Conversion Components. hole to operate the gas cock. Remove Gas cock 2 Heat Shield...
  • Page 4 9. Apply the conversion notice labels included in the kit to the appliance where they will be visible to any Figure 7. person who may be servicing the unit. Pressure test E - Inlet A - Manifold points. • Label “A”: Apply to the right side compartment adjacent to the Rating Plate.

This manual is also suitable for:

157784157785