Download Print this page
Foundations 100-SSC-R Installation Instructions

Foundations 100-SSC-R Installation Instructions

Clad stainless steel changing station

Advertisement

Quick Links

Model 100-SSC-R
• Failure to follow these warnings and the installation instructions could result in serious injury
or death.
• Read all instructions before installing diaper changing station. Keep these instructions. DO NOT
discard.
Clad Stainless Steel Changing Station
Installation Instructions
(Recessed Mount)
IMPORTANT: RETAIN FOR FUTURE
REFERENCE. READ CAREFULLY
WARNING
AVERTISSEMENT
ADVERTENCIA
SI258R-H

Advertisement

loading
Need help?

Need help?

Do you have a question about the 100-SSC-R and is the answer not in the manual?

Questions and answers

Summary of Contents for Foundations 100-SSC-R

  • Page 1 Installation Instructions (Recessed Mount) IMPORTANT: RETAIN FOR FUTURE REFERENCE. READ CAREFULLY Model 100-SSC-R WARNING • Failure to follow these warnings and the installation instructions could result in serious injury or death. • Read all instructions before installing diaper changing station. Keep these instructions. DO NOT discard.
  • Page 2 INSTALLATION INSTRUCTIONS ADULT INSTALLATION REQUIRED. TOOLS REQUIRED: Level (A) Measuring tape (B) Power drill with 3/16” masonry bit (C) Power screwdriver with bull nose phillips bit (D) Truss head spanner bit (E) • READ ALL INSTRUCTIONS BEFORE ASSEMBLY OF DIAPER CHANGING STATION. •...
  • Page 3 INSTALLATION Recommended Blocking: 35 5/8" 1" (905 mm) Wood double stud blocking is necessary. Contact an architect and (25.4 mm) 3 7/8" VIEW (98.4 mm) with building codes (Fig. a.). 35 5/8" (905 mm) Rough-in Double Stud For A. D. A. compliance, top of lower double stud should be 28” (71 cm) from the floor.