Download Print this page

Panel Installation - golmar iPlus EL632/IP Instruction Manual

Video module

Advertisement

EL632/IP VIDEO MODULE
DOOR LOCK CONNECTION
R1 and R2 are dry contact relays to drive ac or dc locks.
Rj45
R2 R2 R1 R1
CV-24/DC
CV-24/DC

PANEL INSTALLATION

Installation of the embedding box:
The upper part of the door panel should be placed at 1,65m. height roughly. The hole dimensions
will depend on the type of door panel.
The door panel has been designed to be placed under most of the environmental conditions.
However it's recommended to take additional cautions like rainproof covers. To obtain a good
quality picture on video door entry systems, avoid direct incidence from light sources.
RF-12/1,25A
230
1650
Door panel
90CS
Model
CEA90C
An
99
Al
143
P
40
Pass the wiring through the hole made in the bottom part of the
embedding box. Level and flush the embedding box. Once
the embedding box is placed, remove the protective labels
from the attaching door panel holes.
Rj45
0
CV-24
CV-24
1850
1450
90
90C
CEV90
CEV90C
99 mm.
99
328 mm.
250
56 mm.
56
TF-104
R2 R2 R1 R1
~ ~
4
230
0

Advertisement

loading