Declaration of Conformity Konformitätserklärung We, Grundfos, declare under our sole responsibility that the products Wir, Grundfos, erklären in alleiniger Verantwortung, dass die Produkte CHV, to which this declaration relates, are in conformity with these CHV, auf die sich diese Erklärung bezieht, mit den folgenden Richtlinien...
Page 3
Prehlásenie o konformite Uygunluk Bildirgesi My firma Grundfos prehlasujeme na svoju plnú zodpovednost’, že Grundfos olarak bu beyannameye konu olan CHV ürünlerinin, AB Üyesi výrobky CHV, na ktoré sa toto prehlásenie vzt’ahuje, sú v súlade Ülkelerin kanunlarını birbirine yaklaştırma üzerine Konsey Direktifleriyle s ustanovením smernice Rady pre zblíženie právnych predpisov...
Page 5
Installation and operating instructions Montage- und Betriebsanleitung Notice d'installation et d'entretien Istruzioni di installazione e funzionamento Instrucciones de instalación y funcionamiento Instruções de instalação e funcionamento Οδηγίες εγκατάστασης και λειτουργίας Installatie- en bedieningsinstructies Monterings- och driftsinstruktion Asennus- ja käyttöohjeet Monterings- og driftsinstruktion Instrukcja montażu i eksploatacji Руководство...
1. General data 1.3.1 Electrical data See pump nameplate. 1.1 Applications 1.3.2 Dimensions The CHV range of Grundfos vertical multistage See page 131. centrifugal pumps are designed for the pumping of water and other thin, non-aggressive and non- 1.4 Sound pressure level explosive liquids, not containing solid particles or fibres.
2. Installation CHV 2 and CHV 4-40/-50/-60: 1. Remove the four staybolts which, from the motor 2.1 Pump location side, are screwed into the discharge chamber. 2. Turn the stator housing to the desired position. The pump must be installed with the motor shaft The discharge chamber must not be turned with vertical.
2.3 Pipework 2.3.1 Suction pipe If the pump is to draw liquid from a level lower than The pipes should be fitted so that any tension the pump suction port, a foot/non-return valve must caused by variations in temperature does not affect be fitted to the end of the suction pipe, below the the pump.
3. Electrical connections 4. Starting The electrical connections should be carried out in 4.1 Priming accordance with local regulations. Do not start the pump until it has been filled with The operating voltage and frequency are marked on liquid and vented. the nameplate.
This product or parts of it must be disposed of in an environmentally sound way: 1. Use the public or private waste collection service. 2. If this is not possible, contact the nearest Grundfos company or service workshop. Subject to alterations.
Page 11
Dimensional sketch 4 x ø14 CHV 2 Pump type [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] CHV 2-40 CHV 2-50 CHV 2-60 Rp 1 Rp 1 CHV 2-80 CHV 2-100 CHV 4 Pump type [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm]...
Page 15
GRUNDFOS Pumps NZ Ltd. Turkey Telefax: +387 33 659 079 29-33 Wing Hong Street & 17 Beatrice Tinsley Crescent GRUNDFOS POMPA San. ve Tic. Ltd. Sti. e-mail: grundfos@bih.net.ba 68 King Lam Street, Cheung Sha Wan North Harbour Industrial Estate Gebze Organize Sanayi Bölgesi...
Page 16
Thinking ahead makes it possible Innovation is the essence 430058 0210 Repl. 430058 0108 The name Grundfos, the Grundfos logo, and the payoff Be–Think–Innovate are registrated trademarks owned by Grundfos Management A/S or Grundfos A/S, Denmark. All rights reserved worldwide. www.grundfos.com...
Need help?
Do you have a question about the CHV 2 Series and is the answer not in the manual?
Questions and answers