Download Print this page

Advertisement

Quick Links

INSTALLATION INSTRUCTIONS
HOGS BACK
EC205S & EC205B
NO PART OF THIS MANUAL OR DOCUMENT MAY BE COPIED OR RE-PRODUCED IN ANY FORM OR BY ANY MEANS WITH OUT THE EXPRESS
WRITTEN PERMISSION OF SMP (PLAYGROUNDS) LTD.
- W: smp.co.uk -
T: +44(0)845 260 1655
E: sales@smp.co.uk

Advertisement

loading
Need help?

Need help?

Do you have a question about the HOGS BACK EC205S and is the answer not in the manual?

Questions and answers

Summary of Contents for SMP Playgrounds HOGS BACK EC205S

  • Page 1 INSTALLATION INSTRUCTIONS HOGS BACK EC205S & EC205B NO PART OF THIS MANUAL OR DOCUMENT MAY BE COPIED OR RE-PRODUCED IN ANY FORM OR BY ANY MEANS WITH OUT THE EXPRESS WRITTEN PERMISSION OF SMP (PLAYGROUNDS) LTD. - W: smp.co.uk - T: +44(0)845 260 1655 E: sales@smp.co.uk...
  • Page 2 HOGS BACK EC205 Page 2 ISSUE D 02-04-2012...
  • Page 3 HOGS BACK EC205 Section 1: x 2= T EC205S 348.00 0.80 3.6 x 2.2 x 2.8 4.00 X 3.00 2.20m T = 4h EC205B 350.00 0.85 TYPE 1/2/3 101/144 6360 2.2 m 3175 2000R 2000R 1500R 1500R 1500R 1500R ISSUE D 02-04-2012 Section 1 Page 3...
  • Page 4 HOGS BACK EC205 EC205B TYPE 1/2 101/144 2.2 m LTB23 LTB49 1485 1890 450 x 450 450 x 450 500 x 500 Section 1 Page 4 ISSUE D 02-04-2012...
  • Page 5 HOGS BACK EC205 EC205S TYPE 3 101/144 LTB23 2.2 m LTB49 1485 1690 450 x 450 450 x 450 500 x 500 ISSUE D 02-04-2012 Section 1 Page 5...
  • Page 6 HOGS BACK EC205 ITEM EC205S EC205B 69.3 3850 LTB23 X 2 37.8 2150 LTB48 X 1 20.25 1125 781-000 LTB49 X 2 18.6 1200 LTB50 X 1 X 11 LTB51 X 11 12.6 2100 LTB52 X 2 780-564 39.5 780-517 3.00 2270 CRS RTB17...
  • Page 7 HOGS BACK EC205 ITEM EC205S EC205B 45043063 780-593 780-600 780-595 0.02 780-594 0.003 780-574 780-576 786-925 0.03 710-085 0.04 10381000 0.002 ISSUE D 02-04-2012 Section 1 Page 7...
  • Page 8 HOGS BACK EC205 ITEM EC205S EC205B 10411000 0.014 10381600 0.007 10321600 0.031 780-585 0.09 10301001 0.001 10309999 0.011 10121030 0.028 10331601 0.02 780-577 0.03 230-074 0.01 78804008 0.75 Section 1 Page 8 ISSUE D 02-04-2012...
  • Page 9 HOGS BACK EC205 ITEM EC205S EC205B 15715000 10051025 0.03 782-000 0.05 786-904 0.023 10121000 10120400 ISSUE D 02-04-2012 Section 1 Page 9...
  • Page 10 HOGS BACK EC205 STEP 1 1 LTB51 X 11 LTB52 LTB52 Section 1 Page 10 ISSUE D 02-04-2012...
  • Page 11 HOGS BACK EC205 STEP 2 LTB48 ISSUE D 02-04-2012 Section 1 Page 11...
  • Page 12 HOGS BACK EC205 STEP 3 1 LTB23 LTB48 1 LTB48 1 LTB23 Section 1 Page 12 ISSUE D 02-04-2012...
  • Page 13 HOGS BACK EC205 STEP 4 1 LTB50 1 LTB49 STEP 5 1 LTB48 ISSUE D 02-04-2012 Section 1 Page 13...
  • Page 14 HOGS BACK EC205 STEP 6 1 LTB48 1 LTB48 ø5 1 LTB48 ø11 1 LTB48 STEP 7 ø5 1 LTB50 Section 1 Page 14 ISSUE D 02-04-2012...
  • Page 15 HOGS BACK EC205 STEP 8A - EC205B TYPE 1/2 1890 CRS REF STEP 8B - EC205S TYPE 3 1690 CRS REF ISSUE D 02-04-2012 Section 1 Page 15...
  • Page 16 HOGS BACK EC205 STEP 9         4&5 STEP 10 1 LTB23 1 LTB48 LTB23 1 LTB48 Section 1 Page 16 ISSUE D 02-04-2012...
  • Page 17 HOGS BACK EC205 STEP 11A - EC205B TYPE 1/2 38° REF STEP 11B - EC205S TYPE 3 38° REF ISSUE D 02-04-2012 Section 1 Page 17...
  • Page 18 HOGS BACK EC205 STEP 12 STEP 13 1 LTB23 STEP 14 1 LTB** Section 1 Page 18 ISSUE D 02-04-2012...
  • Page 19 HOGS BACK EC205 Appendix A: 6380 2615 2445 3185 2615 2445 TYPE 1/2 LOOSEFILL 5695 2310 1710 2725 2310 1710 TYPE 3 SYNTHETIC ISSUE D 02-04-2012 Appendix A Page 19...
  • Page 20 HOGS BACK EC205 1500 2850 6000 TYPE 5 GRASSMATT FR 1500 2625 5250 TYPE 5 GRASSMATT FR - WEAR AREA Appendix A Page 20 ISSUE D 02-04-2012...
  • Page 21: Control Measures

    Suitable working platform to provide secure access and provide support for parts required. SPECIFICATIONS SMP Playgrounds Ltd recommends an effective Impact Absorbing Surface tested to EN1177 & BS7188 beneath this play equipment. Refer to manufacturers instructions for details of installation. The surface should have a Critical Fall Height greater than the Maximum Free Fall Height of the equipment.
  • Page 22 HOGS BACK EC205 ESTABLISH ORIENTATION Measure out the site to ensure the space required fits into the allotted area, it is horizontal and free from trip points or other obstructions. vii) Ensure the equipment is to be provided with an effective Impact Absorbing Surface which has a tested critical fall height rating greater than the maximum Free Fall Height of the equipment.
  • Page 23 HOGS BACK EC205 vii) Assemble Ramp Cross Log (Item 1 - LTB50) to the 2 Ramp Upright Posts (item 1 - LTB49) using 2 off M16 X 240 Stud (item 11) and 4 off M16 Washers (item 16) and M16 Nyloc Nuts (item 17). Ensure Ramp Cross Log (Item 1 - LTB50) is fitted to correct side of Upright Posts (item 1 - LTB49).
  • Page 24: Post Installation Inspection

    HOGS BACK EC205 POST INSTALLATION INSPECTION CHECK CHECK The unit is installed at the correct height. All fixings are tightened and have no protruding sharp edges. All wooden parts should have no sharp edges or cracks. Ensure all plastic plugs are correctly fitted. Ensure Manufacturers Label is fitted.

This manual is also suitable for:

Hogs back ec205b