Page 2
S19-300T, S19-300B—Class 1, Div. 1, Groups C & D Installation WARNING Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the unit should be "ON" at all times unless system is being serviced.
Page 3
The ANSI/ISEA Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed emergency fixtures require a minimum of 30 PSI (0.21MPa) flowing pressure. Flushing should be tepid per ANSI Z358.1...
Page 4
S19-300T, S19-300B—Class 1, Div. 1, Groups C & D Installation Components 11.12 11.11 11.1 Eyewash Assembly Option S05-171 Plastic Stainless Steel Showerhead Showerhead Prepack S45-1535 Eye/Face Wash P.O. Box 309, Menomonee Falls, WI 53051 Assembly TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
Page 5
S19-300T, S19-300B—Class 1, Div. 1, Groups C & D Installation Supplies Required • (3) ⁄ " floor anchors and bolts • Teflon tape and pipe sealant Top Supply • Piping to 1¼" NPT water supply inlet on unit with 1¼" NPT adequate supply pipe supports 37¾"...
Page 6
S19-300T, S19-300B—Class 1, Div. 1, Groups C & D Installation Optional Alarm System Amber Lamp = Heater ON Green Lamp = Power TO UNIT Green Alarm White Ground Screw-in System Black Junction Box Option Indicator Light Option Green White Black...
S19-300T, S19-300B—Class 1, Div. 1, Groups C & D Installation Junction Box and Thermostat (Item 9) apply to both top and bottom supplies. Optional Freeze and Scald Valve (for bottom supply) NOTE: Specify required 13.1 length for Item 30 when ordering.
Page 8
S19-300T, S19-300B—Class 1, Div. 1, Groups C & D Installation Problem Cause Solution Low water flow at drench Insufficient pressure Minimum 30 GPM required shower and eyewash Undersized supply piping Increase pressure/pipe size Low water flow at drench Debris in system...