4.3. AUTOMATISM SYSTEM TEST
Once installation of the operator has been completed, make a careful functional check of all accessories and safety devices
connected.
Give the Client the "User Guide" and demonstrate the correct operation and use of the gearmotor, highlighting the potentially
dangerous zones of the automated system.

5. MANUAL OPERATION

If it is necessary to manually actuate the gate due to lack of power or disruption of
automation, you must act on the release as follows.
LEVER UNLOCK
1) Insert the key supplied in the plastic fold and open it.
2)Pull the lever unlock.
3)Open or close the gate manually.

6. RESTORING NORMAL OPERATION

To prevent an inadvertent boost could move the gate during the maneuver, turn off the power supply , before locking again the motor.
LEVER UNLOCK
1) Close the unlock lever.
2) Move the gate until the release system meshes.
3) Close the plastic fold and restore the power supply to the system

7. MAINTENANCE

Check the functional operation of the system at least every six months, especially the efficiency of the safety devices (including the
operator thrust force) and the release devices.
7.1. OIL FILLING
Periodically check the amount of oil within the operator.
For medium-low frequency of use, an annual check is enough, for more intensive use it is recommended every 6 months.
To make filling, unscrew the cap and load until the level.
8. REPAIRS
For any repairs, contact Norton's authorised Repair Centres.