Rack Mount Installation; Tower Installation - INFOSEC UPS SYSTEM E3 PERFORMANCE RT Series Manual

Hide thumbs Also See for E3 PERFORMANCE RT Series:
Table of Contents

Advertisement

Available languages

Available languages

2.3 Install the UPS
For safety consideration, the E3 Performance is shipped without connecting battery wires.
Before installing the UPS, please follow the steps below to re-connect battery wires.
Step 1
Remove front panel.
Rack-mount installation
Step 1

Tower installation

Step 1
2.4 Setup the UPS
Step 1 - UPS input connection
Plug the UPS into a two-pole, three-wire, grounded receptacle only. Avoid using extension
cords.
INFOSEC UPS SYSTEM - 15, rue du Moulin - 44880 Sautron - FRANCE - www.infosec-ups.com
32
Hot Line – Tel + 33 (0)2 40 76 15 82 - Fax + 33 (0)240 94 29 51 - hotline@infosec.fr – 06 17 AA 59 205 05
Step 2
Connect the AC input and
re-connect battery wires.
Step 2
Step 3
Put the front panel back to the
unit.
Step 2
Step 3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E3 PERFORMANCE RT Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF