Viessmann VITODENS 111-W Installation And Service Instructions Manual page 9

4.7 to 35.0 kw gas condensing storage combi boiler natural gas and lpg version
Table of Contents

Advertisement

Preparing for boiler installation
Safety assembly to DIN 1988 and EN 806 at the cold water connection
A
B
D E
F
GH D
C
O
Fig. 2
Safety assembly (accessories for connection sets
A
for unfinished walls)
Safety valve
B
Visible discharge pipe outlet point (tundish)
C
Shut-off valve
D
Flow regulating valve (installation recommended)
E
Pressure gauge connection
F
Non-return valve
G
Combination inlet group
Combines elements
,
A
M
Pressure reducing valve
This must be installed near the cylinder. The cold
water supply to any mixer taps/showers must be
taken from the cold water tapping of this valve to
ensure balanced hot and cold pressures. This valve
is factory set to ensure the correct operating pres-
sure.
Non-return valve
This is integral to the pressure-reducing valve to pre-
vent the backflow of hot water towards cold water
draw-off points.
Cold water expansion relief valve
This safety device is preset at the factory and will
relieve excess cold water pressure resulting from a
fault condition.
(cont.)
D H L
K
and
N
M
D N K
Drain
H
Cold water
K
Drinking water filter
L
Pressure reducer to DIN 1988-2, Dec. 1988 issue
M
Non-return valve/pipe separator
N
Cold water connection at connection set (accesso-
O
ries)
Preparing for installation
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents