Prepare The Fireplace; Standoff Installation - Heat & Glo Foundation Series Installation And Operating Manual

Co-linear direct vent gas fireplaces
Table of Contents

Advertisement

CAUTION: FIREPLACE IS NOT LOAD-BEARING.
NOTE: OTHER CLEARANCES APPLY. ALL CLEARANCES MUST BE MAINTAINED.
A. STANDOFF INSTALLATION
LOOSEN SCREW
AND FOLD EACH
STANDOFF
STEP 1: Refer to Figure 3A.1
The (4) standoffs will be shipped in a flat state placed on the firebox top.
Locate the standoffs and loosen the screws holding them in place.
STANDOFFS
The See Through fireplace has
a quantity of four (4) standoffs
that are secured with
two (2) screws each (left and
right sides of top).
Figure 3A.3
Placement of the standoffs and nailing flanges
on the See Through fireplace.
8
Heat & Glo • FDN-4-ST, FDN-5-ST, FDN-6-ST, FDN-7-ST Installation Manual • 16400-9801 Rev. H • 11/19

3 - PREPARE THE FIREPLACE

REMOVE
SECOND SCREW
Figure 3A.1
PIVOT FOLDED STANDOFF
AND SECURE
STEP 2: Refer to Figure 3A.2
Fold the center of the standoff up and both ends out at the perforated
lines. Using Figure 3A.2 for reference, locate the second pre-installed
screw on the firebox top at each standoff location. Remove the screw,
pivot the folded standoff into location and re-install the screw to secure
the standoff. Tighten up the screw that was loosened in Step 1.
LOOSENED SCREW
Figure 3A.2
NAILING FLANGES
The See Through fireplace has a
quantity of eight (8)
nailing flanges that are
secured with two (2) screws each
(left and right sides of fireplace).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fdn-4-stFdn-6-stFdn-7-stFdn-5-st

Table of Contents