Safety Information Pre-Installation 1. Unit is rated for water pressures up to 150 PSI. Pressure CAUTION • Never allow children or unauthorized personnel to handle gauge installation (upstream, prior to water inlet) is equipment. recommended to determine proper and constant water •...
Check Valve Replacement (For Globe Valve Units Only): 8. Mixing unit is now ready for piping. 9. Install water supply lines to mixing unit inlets. (Pipe 1. Remove check valve connection nut. thread sealant or alternative such as Teflon tape is 2.
Page 4
3600M with Globe Valve 3600M with Globe Valve Front View Drawing Side View Drawing...
Page 5
3600BM with Ball Valve 3600BM with Ball Valve Front View Drawing Side View Drawing...
Description prevent debris from entering the unit? GVCP-8 Globe valve stem packing (Teflon) SuperKlean does recommend the use of strainers at the GVCP-9 Globe valve stem nut gasket (Teflon) inlets simply because they reduce the flow into the unit and...
Page 7
WORLDWIDE HEADQUARTERS CORPORATE ADDRESS SuperKlean Washdown Products 1 Edwards Court, Suite 101 Burlingame, CA 94010 EMAIL sales@superklean.com DIRECT (800)769-9173 (650)375-7001 TECHNICAL SUPPORT (650)375-7001 SHIPPING/LOGISTIC SUPPORT (650)375-7001 SUPERKLEAN BUSINESS HOURS 8am-5pm Monday-Friday PST...