Operating Procedure - dehn DRC SCM XT Quick Start Manual

Surge protection
Table of Contents

Advertisement

Available languages

Available languages

Quick Guide
DEHNrecord DRC SCM XT

6. Operating procedure

Note: Programme an address on the SPDs to be monitored before use (see 7).
1
Configuration OK
Start sequence (5 sec.)
1a
LED
FM
21 22
DRC SCM XT automatically loads the last valid monitoring status
2
Monitoring status
All SPDs OK
Replace at least one SPD
Note: When delivered, the monitoring status is set to "Replace all SPDs"
3
Page 5
Boot up
Checking the configuration (DIP switch see 5.)
FM
21 22
21 22
DRC SCM XT automatically starts the test cycle
3
a
Checking the assigned SPDs
LED
3
b
Status display
Display of the monitoring status
LED
FM
21 22
or
21 22
e.g. SPD No. 2
Note:
Ongoing tests (LED
button (see 9.)!
Configuration not OK
Configuration faulty
1b
LED
FM
21 22
⇒ Configuration see 5.
Status
3 min.
OK
1 min.
LifeCheck faulty,
replace SPD
) can be aborted by pressing the ctrl