Download Print this page

Operational Tests - BRP EVINRUDE ICON Series Instructions Manual

Gateway module and cable kit
Hide thumbs Also See for EVINRUDE ICON Series:

Advertisement

Available languages

Available languages

NMEA 2000 Network/Gauge Connection
Install the t-connector from the kit to the NMEA
2000 network.
Connect the NMEA 2000 network cable to the
t-connector of the gauge network.
Connect the NMEA 2000 network cable to the
NMEA 2000 connector of the gateway module.
Refer to the current I-Command Installation
Guide.
IMPORTANT: Do not force connectors or lock-
ing rings. Properly aligned connectors should as-
semble easily.
Fuel Level Sender Connection
Use heat shrink butt connectors, P/N 502526, to
connect pink and black wires from fuel level
sender(s) to gateway module pink and black
wires.
Gateway module fuel sender wires are labeled
for connection to specific fuel tanks.
Connect fuel level sender wires labeled "1" from
gateway module to main (or single) fuel tank
wires. Connect remaining fuel level sender wires
from gateway module to other fuel tank(s) wires
in numerical order.
4 of 5
Use a multi-purpose crimp tool, such as
P/N 500906, to install connectors onto wiring.
Heat butt connectors to provide water-resistant
seal.
Use tie straps to secure harnesses and cables
once installation of all components is complete.
Connect the battery cables at the battery.

OPERATIONAL TESTS

Turn the master power/key switch to the RUN
position. All devices connected to the ICON
control system and gauge network should turn
on.
Turn the master power/key switch to the OFF
position.
Refer to I-Command User's Guide for set up
and operation of NMEA 2000 network and
I-Command gauges.

Advertisement

loading