Download Print this page

Kaldewei CENTRO DUO OVAL Manual page 5

Whirlsystem vivo vita

Advertisement

INSPECTION OPENINGS
For data on size and position of inspection openings see
also the Installation Instructions page 7.
BATHTUB MODEL
CENTRO DUO OVAL
CENTRO DUO 2
CENTRO DUO 1
CENTRO DUO
CENTRO DUO 6
MEGA DUO OVAL
MEGA DUO
MEGA DUO 6
PLAZA DUO
PUNTA DUO 3
CLASSIC DUO
CLASSIC DUO OVAL
CLASSIC DUO OVAL WIDE
CONO DUO
ASYMMETRIC DUO
PURO
RONDO/STAR
RONDO 6/STAR
RONDO 8/STAR
VAIO DUO OVAL
VAIO 6/STAR
VAIO DUO
VAIO DUO 3
VAIO DUO 6
VAIO DUO 8
INSPECTION OPENING A
INSPECTION OPENING B
INSPECTION OPENING C
8
127/128
A
131/135
A
129/130/136/137
A
132/133
A
134
B
184
A
180
A
182
B
190/192
A
910
C
105/107/109/110/114 A
111/113
A
115
A
732/733/734/735
A
740/742/744
A
652/653/656/657/
A
683/684/687/688/
691/692/696/697
700/701/710/711
A
706/707/716/717
B
708/709/718/719
B
951
A
958/959
B
950
A
962
C
952
B
953
B
POINTING THE CASING JOINTS
After the functional check, the casing can be sealed with
the appropriate flexible sealing material (e.g. silicone,
acrylic).
• Point the continuous edge below the bathtub rim (A)
with sealing material and let it rest until the sealing
material has hardened completely (see manufacturer's
instructions).
For the operation of the whirlpool it is absolutely
necessary that air can circulate underneath the
pool. The bottom edge (B) of the casing must not
be pointed.
D
GB
F
I
E
A
PRC
B

Advertisement

loading

This manual is also suitable for:

Mega duo ovalCentro duo 6Mega duo 6Punta duo 3Classic duo ovalClassic duo oval wide ... Show all