Page 1
Telescopic rod projector lift installation manual Model:GPCD58 Series Grandciew Crystal Screen Guangzhou Co.,Ltd. Guangzhou Jude Intelligent Audiovisua l Equipment Co., Ltd. No.43 S, Guomao Ave. H ualong, Panyu, Guangzhou, Guangdong, P.R.C http://www.grandviewscreen.com After-sales service T el:0 20-84899499 Thank you for purchasing this product. Please read the manual carefully before use.
Page 2
The design of this product can be used without failure for many years, many problems are caused by simple things. If something goes wrong, check out our simple fix list.If the problem continues, please contact the authorized dealer or call the after-sales service number: 020-84899499-509 Trouble The cause of the trouble The solution...
Page 3
Caution 1.Please ensure the installation ceiling be secure enough to avoid falls, The loading capacity must be 4 times of the projector lift and the projector. 2.Please tighten all the screws and check whether it become loose regularly, to ensure safety use. 3.Please do some regular maintenance.
Page 4
Components Remote control Notes 1.Working temperature: -20℃ to +70℃ 2. Battery: 2 pcs of RC2032 button battery GPAD64 Series Projector Lift Traction wire electronic 3.Requires replacement battery when given positioning setting button signal weak Battery 1.Control panel Battery installation: 2.Electric ceiling door Battery When remote control signal weak, please replace 3.Ceiling bezel...
Remote Localizer Installation When it is necessary to set the lower limit, open the electric double door. When the laminate reaches the ceiling, press the pause button to use the keyhole on the back of the remote controlWhen the needle is inserted into the Installation instructions blue light, the hanger will enter the preset state and reach the position required by the customer.
Installation steps Angle adjustment 1.determine the direction of the projector and the installation position, according to the size of the opening in the ceiling layer. Rotate left and right ±3° Rotate left and right Use a hex wrench to loosen the two screws on the front end. As shown by the arrow in Figure 1, the universal joint can be adjusted to the left and right by ±3°.
3.After checking that the tapping screw is fixed, install the screw rod and fix it. (In order to 5.Install the decorative frame so that the decorative frame fits on the ceiling layer and the make the screw rod easier to pass through the lifter, we recommend that the end of the installation is completed.
Need help?
Do you have a question about the GPCD58 Series and is the answer not in the manual?
Questions and answers