Motorola R2010D Operator's Manual page 34

Communications system analyzer
Table of Contents

Advertisement

Accept SAT.
Send power level command. High power.
Accept order confirmation.
Manual power level testing permitted. Select power level
0-7.
Handoff testing permitted. Handoffs to FVC #1-4
allowed.
Confirm 50 msec signaling tone for handoff. Switch to
new FVC.
SAT drop testing permitted. SAT selections 1-3 allowed.
Repeat power level and/or handoffs as desired.
Temporary exits allowed to analyze signals using the
other R2008D/R2010D modes.
Accept 1.8 second termination signaling tone. Display
error if out of limits.
End of mobile initiated sequence test.
29
Enter conversation task.
Adjust power level to high and send order confirmation.
Adjust power level to that requested and send order
confirmation.
Handoff confirmation is 50 msec signaling tone.
Change to new RVC.
If a new SAT is selected, the mobile should drop after
5
seconds.
On-hook (mobile hangs up). Sends 1.8 second signaling
tone (1OKHZ)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R2008d

Table of Contents