HP 3000 9 8LX Series Installation And Configuration Manual page 20

Pa-risc computer
Table of Contents

Advertisement

Table 2·6. Technical TasksjPersonnel
Technical Task
Person Responsible
Line voltage measured
Electrician and
HP
CE
Power line frequency measured
HP
CE
Power line noise levels measured
HP
CE
Neutral to ground levels measured
HP
CE
Safety and ground connections verified
Electrician and
HP
CE
Advice on correct circuit breakers and wire sizes
Electrician and
HP
CE
Verification that maintenance power outlets (those used for
Electrician
floor cleaning, etc.) are on separate circuits from the
computer system.
Recommendations about lightning protection
HP
CE
Measurements and recommendations on radiated interference
HP
CE
Answers to questions concerning modems and modem
HP
CE
options
Thermal load of
HP
equipment
HP
CE
Thermal load of non-HP equipment
Customer/Vendor
Total air conditioning required
Customer /Contractor
2-6
Site Considerations

Advertisement

Table of Contents
loading

Table of Contents